TNA of the RadioNet3 project covers 9 telescopes/arrays:

  • EVN (Bob Campbell)
  • e-MERLIN (S. Garrington)
  • Effelsberg (A. Kraus)
  • WSRT (A. Polatidis)
  • LOFAR (A. Polatidis)
  • APEX (Magnus Thomasson)
  • IRAM: NOEMA (Roberto Neri)
  • IRAM: PV (Nicolas Billot)

Simon Garrington is additionally the TNA coordinator representing the TNA in the management bodies of the project.


TNA Real Cost Calculation - FORUM



TNA meetings / teleconferences

DatePlaceParticipantsMinutes (Status report)
05.11.2015BrusselsK. Adunmo, B. Campbell, J. Casado Iglesias, S. Garrington, A. Kraus, R. Neri, A. Polatidis, I. Rottmann, L. Saracco, M. Thomasson, A. van den PollReport
22.09.2015teleconferenceN. Billot, B. Campbell, J. Casado Iglesias, S. Garrington, A. Kraus, A. Polatidis, I. Rottmann, M. Thomasson, A. van den PollReport
06.05.2015teleconferenceN. Billot, B. Campbell, J. Casado Iglesias, S. Garrington, A. Kraus, R. Neri, I. Rottmann, M. ThomassonReport
04.02.2015teleconferenceN. Billot, B. Campbell, S. Garrington, A. Kraus, R. Neri, I. Rottmann, M. Thomasson, H.-R. KlöcknerReport
21.10.2014BrusselsJ. Casado Iglesias, S. Garrington, A. Kraus, R. Neri, A. Polatidis, I. Rottmann, M. Thomasson, A. van den PollMinutes
21.05.2014teleconferenceR. Campbell, J. Casado Iglesias, S. Garrington, H.-R. Klöckner, A. Kraus, K.-H. Mack, R. Neri, A. Polatidis, I. Rottmann, M. ThomassonMinutes
13.02.2014BrusselsN. Billot, R. Beswick, R. Campbell, J. Casado Iglesias , S. Jester, S. Garrington, A. Kraus, R Neri, A. Polatidis, I. Rottmann, L. Soracco, A. van del Poll, A. ZensusMinutes
10.09.2013teleconferenceN. Billot, R. Campbell, S. Garrington, K.-H. Mack, R. Neri, A. Polatidis, M. Thomasson, I. Rottmann, J. Casado Iglesias, A. van del PollReport
06.06.2013teleconferenceN. Billot, R. Campbell, S. Garrington, A. Polatidis, I. Rottmann, F. Mantovani, J. Casado Iglesias, A. van del PollReport
14.05.2013teleconferenceC. Berjaud, N. Billot, R. Campbell, S. Garrington, A. Kraus, R. Neri, A. Polatidis, M. Thomasson, I. Rottmann, F. Mantovani, J. Casado Iglesias, A. van del PollReport
21.02.2013teleconferenceN. Billot, R. Campbell, A. Kraus, S. Garrington, R. Neri, A. Polatidis, I. Rottmann, M. Thomasson, J. Casado Iglesias, A. van del PollReport
23.10.2012teleconferenceR. Neri, C. Berjaud, S. Garrington, K.-H. Mack, I. Rottmann, R. Campbell, M. Thomasson, A. Polatidis, A. Kraus (update per e-mail N. Billot, I. Coulson)Report
05.09.2012teleconferenceS. Garrington, I. Rottmann, K.-H. Mack, T. Magnusson, A. Kraus, A. Polatidis (update per e-mail N. Billot, R. Neri, B. Campbell, I. Coulson) Report
03.05.2012teleconferenceR. Neri, N. Billot, R. Campbell, S. Garrington, T. Muxlow, R. Beswick, A. Polatidis, R. vermeulen, A. Kraus. I. Rottmann, A. Danzel (update per e-mail:I. Coulson) Report
29.02.2012Bonn /Germany V. Avontis, N. Billot, I. Coulson, R. Campbell, F. Colomer, A. Danzel, I. Eriksson, S. Garrington, I. Kozlova, A. Kraus, K.-H. Mack, M. Nantrop Persson, R. Neri, L. Palaric, I. Rottmann, I. Smelds, M. Thomasson, A. van den Poll, R. Vermeulen, S. Wiegel, A. ZensusMinutes


Deliverables

Del.InfrastructureScheduled DateSubmission DateTitle
D12.3EVN12.201503.07.2015Providing access of 246 hours
D14.3e-MERLIN2.201502.12.2015Providing access of 257 hours
D15.3Effelsberg12.201516.12.2015Providing access of 370 hours to the infrastructure Effelsberg
D16.3LOFAR12.201511.12.2015Providing access of 202,8 hours to the LOFAR infrastructure
D17.3WSRT
D18.3PdBI + PV12.201518.11.2015Providing acces of 60,9 (NOEMA) & 213,8 (PV) hours to the IRAM infrastructure
D19.3APEX12.201531.05.2015Providing access of 75 hours
D12.2EVN06.201426.03.2014Providing access of 164 hours
D14.2e-MERLIN06.201401.07.2014Providing access of 172 hours
D15.2Effelsberg06.201430.06.2014Providing access of 238 hours
D16.2LOFAR06.201404.07.2014Providing access of 117 hours
D17.2WSRT06.201401.07.2014Providing access of 227 hours
D18.2PdBI + PV06.201328.06.2013Providing access of 40 (PdBI) + 104 (PV) hours
D19.2APEX06.201406.06.2014Providing access of 75 hours
D12.1EVN06.201328.06.2013Providing access of 246 hours
D14.1e-Merlin06.201328.06.2013Providing access of 257 hours
D15.1Effelsberg06.201328.06.2013Providing access of 370 hours
D16.1LOFAR06.201328.06.2013Providing access of 173 hours
D17.1WSRT06.201328.06.2013Providing access of 250 hours
D18.1PdBI + PV06.201328.06.2013Providing access of 46 + 153 hours
D19.1Apex06.201328.06.2013Providing access of 113 hours