Table of Contents

TOG - Agenda, January 23, 2014

  1. Local Arrangements/Opening Remarks (Neidhardt, Lindqvist)
  2. Approval & last minute additions to Agenda (all)
  3. Acceptance of minutes from last meeting (all) Bonn, April 10, 2013
  4. Review of Action Items from last meeting (all; see appended list)
  5. RadioNet3
    • ERATec (Lindqvist)
  6. Reliability/Performance of the EVN
    • Reliability/Performance of the EVN (Yang), Presentation
    • Pre-session checks, e.g., sampler stats, phase-cal, RFI … (Yang)
    • NME results (Yang)
    • Feedback from last sessions (Yang)
  7. Amplitude Calibration
    • Quality of calibration (Yang), Presentation
    • Timely delivery of ANTAB-files? (Yang)
    • ANTAB-files new systems (all)
    • Beam-shapes for calibrating off-axis detections (Keimpema), Presentation
  8. Digital BBC-systems
    • DBBC development and production status, (Tuccari), Presentation
    • DBBC experience at stations (all)
    • DBBC spare parts (Lindqvist, Tuccari)
    • DBBC feedback from JIVE (Campbell)
    • R1002 and CDAS feedback from JIVE (Campbell)
    • DSN VLBI Processor (Cristina Garcia-Miro), Presentation
  9. JIVE
    • Technical Operations and R&D at JIVE, (Szomoru), Presentation
  10. Joint EVN + LBA observing (Szomoru) Presentation
  11. Technical priorites for the EVN
    • Recording/playback systems in the EVN (Szomoru), Presentation
    • FB2HB2MB6 (Mujunen), Presentation
    • Towards 2-4 Gbps operation (Szomoru, Lindqvist)
    • 64 Gbps with ALMA (Alef), Presentation
    • Development of a Low-noise wide-band integrated amplifier for VLBI antennas, RadioNet3/DIVA Task 1 (Alef), Presentation
    • DBBC3, RadioNet3/DIVA Task 2 (Tuccari, Casey), Presentation
  12. Out-Of-Session observing (all), Report written by R. Porcas
  13. Triggered/interrupted e-VLBI observations (Casey, all), Presentation
  14. SCHED Developments
    • Maintenance of Sched when C. Walker retires (Campbell)
    • Digital BBC-systems, Mark 5C, 2-4 Gbps operation etc. (Campbell)
    • Cable wrap in astronomical schedules (Campbell)
  15. Field System, status and new features
  16. NRAO
  17. Haystack
  18. Mark 5,6
    • Status: Mark 5A/B/B+/C, 6, software, firmware, SDK9 (Ruszczyk), Presentation
    • jive5ab (Verkouter), Presentation
    • Mark 5 problems encountered during last session, (all)
    • Disk inventory and purchase status – 7000 € per station/year (Lindqvist, all)
    • Disk throughput at JIVE, balancing with NRAO, Astro/Geo pool (Campbell)
    • Mark 5 logistics (repairs, shipping rules, VLBA shipping requirements, boxes, labels, etc.) (all)
  19. Activities at EVN stations
  20. Activities at potential new EVN stations
  21. Upcoming meetings (Lindqvist)
    • 8th IVS General Meeting, 2-7 March, 2014, Shanghai, China
    • CANCELLED: RadioNet3 ERATec Workshop, Antenna metrology meeting, 6-12 July, 2014, Memphis, Tennessee, USA
    • EVN Symposium and Users' Meeting, 7-10 October 2014, Cagliari, Italy
    • 3rd International VLBI Technology Workshop, JIVE, The Netherlands
  22. Date and place of the next TOG meeting
    • October 5-6, Cagliari, Italy
  23. AOB

Action Items from the Bonn meeting:

  1. Make sure that the SCHED catalogue is updated when a DBBC (or other new equipment) is taken into production. Friends should send information to Campbell.
  2. All stations: check out the spare part list on the wiki and make sure that each institute contributes. https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/EVN_spare_parts
  3. Bach/Alef: Look for new possibilities to implement phasecal.
  4. All L- and C-band stations: determine beam shapes at L- and C-band, if possible at different elevations. Send results, as well as the elevation intervals used, to Keimpema.
  5. Leeuwinga: send information to stations on how to include the Mark5 command 'get_stats' correctly in the procedure file.
  6. Alef: send information to stations on conditioning code of Brisken.
  7. Verkouter: see if the conditioning code can be incorporated in jive5ab.
  8. Yang: write piece on phase errors and determination of accurate positions in next EVN newsletter.
  9. All stations: install Burgess's script lgput to send logfile to vlbeer automatically.
  10. All stations: send any information on any update of station position to Campbell and/or Yang.
  11. All stations (except Wetzell): implement 80 Hz continuous calibration.
  12. All stations: report Mark5C bugs to Ruszczyk.
  13. All stations: upgrade any FS 9.11.x to at least 9.11.2 if they are using a Mark5B (fix of automatic bank switching).

Summary of ”Permanent” Actions/TOG recommendations

EVN SPARE PARTS:

EVN DISK POOL:

IN ADVANCE OF SESSION:

SESSION PREPARATION:

DURING SESSIONS:

POST SESSION FEEDBACK: