Presentations:
Notes from the TOG chair (P. de Vicente)
EVN amplitude calibration analysis (M. Mao
EVN performance (M. Mao)
DBBC2 status (W. Alef)
jive5ab and tools (H. Verkouter)
Mark5 software status (C. Lonsdale)
Kvazar (Marshalov)
SFXC and other issues (M. Kettenis)
2 gbps evlbi software issues (H. Verkouter)
DIVA (W. Alef)
BRAND (W. Alef)
NRAO status
Haystack status (C. Lonsdale)
NOEMA status
Technical Operations and R&D at JIVE (A. Szomoru)
FS (E. Himwich)