Table of Contents

EVN TOG-meeting, Onsala Space Observatory, 09:00 Thursday 28th June 2012

Agenda

  1. Local Arrangements/Opening Remarks (Lindqvist)
  2. Approval & last minute additions to Agenda (all)
  3. Acceptance of minutes from last meeting (all) Arecibo, August 30, 2011
  4. Review of Action Items from last meeting (all; see appended list)
  5. Reliability/Performance of the EVN
    • Pre-session checks, e.g., sampler stats, phase-cal, RFI … (Yang)
    • Extending “near-realtime” fringe checks, status (Yang)
    • NME results (Yang)
    • Feedback from last sessions (Yang)
    • Timeliness of disk shipments (Tenkink / Leeuwinga)
  6. Amplitude Calibration
  7. Digital BBC-systems (DBBC, R1002, CDAS)
  8. JIVE
  9. 2-4 Gbps observations EVN, EVN+VLBA
    • Tests with DBBCs at 2-4 Gbps (Szomoru, Verkouter, Bach, Lindqvist, Tuccari)
    • EVN stations without DBBC: how will 2-4 Gbps be done? (all)
    • Boundary conditions for co-observing with the VLBA at 2 Gbps (all)
  10. Haystack
  11. Mark 5
    • Planning upgrade to SDK 9 and large disks (all)
    • EVN Mark 5A program: feedback d-VLBI/e-VLBI, could it be used for disk-recording? (all)
    • Mark 5 problems encountered during last session, e.g., large disks (all)
    • Disk inventory and purchase status – 7000 € per station/year (Lindqvist, all)
    • Disk throughput at JIVE, balancing with NRAO, Astro/Geo pool (Campbell)
    • Mark 5 logistics (repairs, shipping rules, VLBA shipping requirements, boxes, labels, etc.) (all), Disk repair statistics (Leeuwinga)
    • Contact person concerning disks in the EVN (Lindqvist)
  12. NRAO
  13. Sched Developments
    • DBBC, RDBE, Mark5C etc. (Campbell)
    • New wide-band frequency standards, RDBE and DBBC, (Campbell)
    • DBBC IF-channel naming convention in Sched (Campbell)
  14. Field System, status and new features
  15. Technical priorites for the EVN
  16. Activities at EVN stations (all)
  17. Activities at potential new EVN stations
  18. RadioNet3 (Lindqvist)
  19. Date and place of the next TOG meeting
    • Bonn, March-April 2013
  20. AOB

Action Items from the Arecibo meeting:

  1. Small (JIVE) and Walker to incorporate information on frequency agility in SCHED.
  2. Szomoru to investigate if/how the number of ftp-tests could be increased, as a high time priority of the NEXPReS project.
  3. Contact details for ToO observations should be put on ToO webpage. This is missing for Arecibo, Wetzell - please forward info to Campbell.
  4. Lindqvist to schedule a telecon between the EVN and VLBA to clarify interoperability issues when need arises.
  5. Lindqvist would like a summary/overview from JIVE of what stations get better or worse after calibration.
  6. Dave Graham to send info about the Mark 5B 1pps issue. (Checking offset between input 1pps and output to confirm it is clean.)
  7. All stations getting DBBCs need to make plans for implementing continuous calibration.
  8. Romney to provide details of VLBA experience with continuous calibration
  9. Software from Eb (dbbcn) to be put on TOG wiki, together with pointers to Hobart DBBC wiki.
  10. All stations should add their information relevant for 2/4 Gbps operation to https://deki.mpifrbonn.mpg.de/Working_Groups/EVN_TOG/Frequency_ranges_for_4_Gbps
  11. Romney to ask Brisken to produce a document about tunability and inter-operatability with VLBA. (RDBE with DBBC).
  12. Lindqvist will raise issue of Kvasar stations buying a suitable amount of diskpacks at CBD.
  13. Romney to put Himwich in contact with NRAO programmers (for RDBE control in FS).
  14. All aspiring stations must attend TOW/TOG mini-workshops first, before we would support them in terms of visits to stations.
  15. Next TOG mini-workshop should include a “How to check out a VLBI station.”
  16. The TOG agrees that normal EVN disk pool should not be used for Radioastron observing - forward to CBD about additional disks required.
  17. Directors agreed each institute to invest ~3000 € in spare parts. Stations to define required items on TOG wiki, purchase (coordinated through Alef) and keep on-site as a hot spare which can be sent to other stations as needed.

Summary of ”Permanent” Actions/TOG recommendations

IN ADVANCE OF SESSION:

SESSION PREPARATION:

DURING SESSIONS:

POST SESSION FEEDBACK: