RadioNet3

Hardware

Liquid Cooling UniBoard, Gijs Schoonderbeek, 10/01/2013

Remarks on Hot Swap Controller old UniBoard, Gijs Schoonderbeek, 28/11/2013

Detailed HW design UniBoard2, Sjouke Zwier / Gijs Schoonderbeek 02/07/2014

HW design for HMC Extension Module (HEM), Gijs Schoonderbeek 17/03/2015

UniBoard2 High-Speed simulations, Gijs Schoonderbeek 28/08/2015

Measurement Report UniBoard2, Gijs Schoonderbeek 28/08/2015

UniBoard2 Manual, Gijs Schoonderbeek 28/08/2015

Prototype Hardware, A. Szomoru, 22.10.2015

Revised hardware design document, Gijs Schoonderbeek, 17/11/2015

Conclusion of pre-production effort, Arpad Szomoru, 21/12/2015

Description of UNB2_TB_220 test board, Sjouke Zwier / Gijs Schoonderbeek 28/01/2016

Risk Analysis for CE marking , Gijs Schoonderbeek 23/03/2016

UniBord2 measurements for CE, Gijs Schoonderbeek 23/03/2016

UniBoard2 Manual , Gijs Schoonderbeek 25/03/2016

Functional Design

UniBoard2 Hardware Ideas, Gijs Schoonderbeek, 16/01/2013

UniBoard2 Architecture / HW selection , Gijs Schoonderbeek 15/01/2014

UniBoard2 Architecture / HW selection, deliverable version, Gijs Schoonderbeek 15/01/2014

Considerations on Uniboard2 I/O, G. Comoretto. 24/09-2013

Uniboard2 Architecture Proposal, G. Knittel, 30/09/2013

UniBoard2 example: 96 transceivers and hybrid memory cube, J. Hargreaves, 25/09/2013

UniBoard2 Design Document: EVN Correlator and SKA Low Frequency Channeliser, J. Hargreaves, 29/01/2014

UniBoard2 Design Document: EVN Correlator and SKA Low Frequency Channeliser, deliverable version, J. Hargreaves, 04/02/2014

Uniboard2 Digital Receiver Firmware Design Document, G. Comoretto, 26/01/2014

UniBoard2 Firmware Design Document – digital receiver, deliverable version, G. Comoretto, 04/02/2014

Uniboard2 Beam Former Firmware Design Document, G. Knittel, 31/01/2014

UniBoard2 Beam Former Firmware Design Document, deliverable version, G. Knittel, 04/02/2014

UniBoard2 RFI Mitigation Firmware Design Document, deliverable version, R. Weber, 18/04/2014

UniBoard2 Digital Receiver Revised Firmware Design Document, deliverable version, G. Comoretto, 25/06/2015

UniBoard2 Revised Design Document: EVN Correlator, J. Hargreaves, 30/06/2015

UniBoard2 Revised Design Document: Beam Former, G. Knittel, 29/07/2015

UniBoard2 Firmware design document: Pulsar Binning, B. Stappers, 02/08/2015

Report on effectiveness of green measures: Correlator, J. Hargreaves, 25/08/2015

Report on effectiveness of green measures: Digital Receiver, G. Comoretto, 17/11/2015

Report on effectiveness of green measures: Beam Former, G. Knittel, 20/11/2015

Firmware

Software

Various

Minutes