**Achievements in reporting period:** *** List of activities organised during reporting period** - 1st EVN TOG Meeting 17. April.2009 Torun/Poland; 27 participants, 9 countries (DE, FI, IT, NL, PL, SE, SP, UK, USA); - 1st Engineering Forum Workshop, 23-24.June.2009 Göteborg/Sweden; 54 participants, 10 countries (DE, FI, FR, IT, NL, SE, SP, UK, USA, ZA); ***Meetings attended – both meetings for NA organisation or meetings on behalf of RadioNet** - see meetings above ***Activities for the Engineering Database** - a preliminary version of a questionnaire to be distributed among the partners has been issued - all the partners have been asked to provide the contact person for data collection **Problems / Issues** * **Issues - organisational, administrative or other problems foreseen** - The meeting in Göteborg was more expensive as assumed, due to the big participants number. However there is no need to worry for the total financial envelope of the WP3-budget. - Local Organisation Costs (LOC) could be smaller if there will be more outreach materials from RadioNet-FP7: e.g. folders, pens, notebooks - Very few answers have been collected in response to the request for a contact person to the database. A different approach will be applied, consisting in a direct visit involving, to a first round, the larger institutes. Then, a final version of the questionnaire will be distributed among the remaining institutes for compilation. * **Red flags - major problems** - It should be clear to all RadioNet-F7 participants that there is an own effort in organisation of a workshop/meeting. Not everything could be paid from the NA budget and not everything can be paid, due to the limited budget. Some financial support from the local organisers could be expected. - The VAT is still an unclear issue to the RadioNet-FP7 partners. I think the decision of the board from 31. March.2009 should be make more clear not only to the board members but also to all partners. - Only two (2) answers have been given in response to the request, sent to all institutes part of Radionet, for a contact person to the database. More participation is therefore hihly desirable. A different approach will be applied as a countermeasure to the actual situation, consisting in a direct visit involving, to a first round, the larger institutes. Then, a final version of the questionnaire will be distributed among the remaining institutes for compilation (presumibly during the second engineering workshop). - There is a problem to view and/or download the PDF files from the wiki page of the Engineering Workshop. That issue was forwarded to the RadioNet-FP7 Management Team and we are waiting for the solution. **Forward Look** * **Plan for next year – 12 months outlook, more detail in first 6 month (including budget for each planned meeting/workshop)** The meetings are orgnised on plan. I can't give any details on the budget of the past and future meetings, since I don't have any end-numbers \\ * **Expected milestones/deliverables** \\ - //Milestones:// * 1st TOG meeting: planned:03 done:04 * 1st EW : planned:06 done:06 * Database Report1: planned:06 done: * 2nd TOG meeting: planned 11 done: scheduled for 11 * 2nd EW : planned 14 done: scheduled for 11\\ - //Deliverables// * 1st TOG meeting Report : planned: 05 done:07 (finacial support issues not completed * 1st EW Report : planned: 08 done: should be on time * Databse Part1 : planned: 12 done: some delay forecasted * 2nd TOG meetin Report : planned: 13 done: should be 11 * 2nd EW Report: planned: 16 done: should be 13 \\ * **Expenditures - equipment, material and services** * Some equipment was bought for the smooth and professional organising and running of the TOG and Engineering Forum meetings: a laptop, adapters (VGA, etc), remote control device, back-up disk drive, computer bag. These equipment is available for the speakers during the meeting, is used for the setting the meetings/workshops organisational issues and additionally serve as a storage of all management issues of that work package. ---- //Done by I. Rottmann (26.06.2009) & E. Limiti (26.06.2009)//